CHOICES | Width2cm there are five sizes to choose |
---|---|
From | 3m 10ft 5m 16 5ft 10m 33ft 15m 49 5ft 20m 66ft In addition the long line lead is mainly mixed with two colors and there are eight colors to choose from to meet different hobbies The shorter lead can be used for daily walking and the longer can be subject to training which is suitable for teaching dog recall or long distance |
Walking | NYLON TRAINING |
LEAD | The leash is strong and made of nylon material this long training lead is durable and heavy duty easy to wear and remove The length of the leash line can allow the dog to wander and ensure that your order is issued Long line for dogs provides a perfect balance between control and the dog s freedom and is not elastic allowing you and your dog to walk or run within a good |
Distance | EXTAR |
FREEDOM | Dogs often inadvertently run long distances or cross the road Long leads for dog training can provide extra freedom Dog training lead can leave a certain space between the dog and the owner and they can also walk freely You can step on the lead rope to ensure safety when necessary Choose the length you need which is very suitable for daily walking running training and other outdoor |
Sports | METAL ROTATING |
BUCKLE | The long dog training leash has a rotating buckle which is easy to hook no tangles and is durable The sturdy hook can be rotated 360 and can be easily fixed to the dog s collar ensuring that the pet can walk or run and play in any direction Also hope that you can regularly check the usage of the |
Hook | WIDELY |
USABLE | The recall training lead can make the dog run freely and teach your dog to recall and train obedience tracking It can be controlled by the strong lead rope when walking in public places It is suitable for large medium and small dogs very suitable for hiking camping training hunting backyard beach outdoor sports or swimming |
£9.59 (£4,795.00 / kg)
You Save £2.00 (17%)
£12.99 (£12.99 / count)
You Save £3.00 (19%)
COMSLE Long Leads for Dog Training, 3m/5m/10m/15m/20m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor Review